Author: beridi

  • All
  • Corporate News
  • Knowledge Center

The detailed engineering of the TRIWIND 1,5MW platform, which will validate the technology at full scale, has been completed.The design of the TRIWIND platform, which excels for its low cost, its simplicity,  its ease of construction, and its outstanding naval behavior is culminated with the...

We will be attending the WindEurope Annual Event 2022 in Bilbao. TheWindEurope Annual Event 2022 will be tackling onshore and offshore wind topics, with 350+ exhibitors from Europe and beyond. The event bring together all the key players of the wind energy sector. The main focus of...

Our first patent called “MARITIME STRUCTURE FOR LAYING THE FOUNDATIONS OF BUILDINGS, INSTALLATIONS AND WIND TURBINES BY MEANS OF GRAVITY IN A MARINE ENVIRONMENT”, which is the mother patent of a 3-patents family, has been granted in China on 4th January 2022 (CN110382781). Saber más...

Europa Press has published an article about our technology for installation of floating wind turbines and the success of the testing campaign we have undergone in 2021 (go to article). “The Spanish company Beridi successfully completes the tests for its floating wind platform for deep waters. The...

Our first patent called “MARITIME STRUCTURE FOR LAYING THE FOUNDATIONS OF BUILDINGS, INSTALLATIONS AND WIND TURBINES BY MEANS OF GRAVITY IN A MARINE ENVIRONMENT”, which is the mother patent of a 3-patents family, has been granted in the United States of America on 3rd November...

Energética XXI has published an article about Beridititled “Beridi develops a project of concrete-based floating wind platforms in deep waters” (go to article). “80% of wind power is found in deep waters, where the wind blows more steadily and at higher speeds. In these waters, the...

Beridi has successfully completed the tests in the Large Tank for Maritime Engineering of Cantabria (CCOB – Cantabria Coastal and Ocean Basin), thus fulfilling another key milestone of the ARCHIME3 project. After the success of the previous validation stages, these tests had the objective of...

Cinco Días, the oldest in the Spanish economic press, publishes an article about Beridi that causes a significant impact in the sector.The article, published in Spanish, is translated next.“THE SPANISH COMPANY BERIDI PLANS TO REVOLUTIONIZE THE OFFSHORE WIND ENERGY SECTOR WITH CONCRETE PLATFORMSBeridi patents a...

Expansión, the newspaper leader in economic press in Spain, has published an article about Beridi and our technology for installation of floating wind turbines. The article, published in Spanish, is translated next. “THE SPANISH COMPANY BERIDI ENTERS IN THE WIND ENERGY RACE The Spanish group Beridi (Berenguer Ingenieros)...